Customers judge your property from the parking lot. Faded stripes, sunken corners and potholes off Battlefield Road or Sunshine Street tell people something before they ever reach your front…
Tell us about your project and we will get right back to you.
Customers judge your property from the parking lot. Faded stripes, sunken corners and potholes off Battlefield Road or Sunshine Street tell people something before they ever reach your front door.
Most failing lots in the Ozarks share the same story. The base underneath was thin, water had nowhere to drain, and one winter of freeze and thaw split the surface wide open. Our parking lot paving in Springfield MO fixes the cause, not just the symptom, because we build the lot from layout and drainage design all the way through base engineering, asphalt placement, striping and ADA spaces.
Asphalt Pavers LLC is family owned, licensed and insured, and we back every project with a 100% satisfaction guarantee. We serve Springfield and Greene County from 434 S Belcrest Ave. Call or text (417) 319-2693 for a free written estimate with no obligation.
This page covers the full build of a lot, start to finish. Whether you need a brand new surface or a complete repave, our crew handles every stage in house so nothing falls through the cracks between trades.
We work with retail centers, office parks, churches, medical clinics and HOA communities. If your project reaches beyond a single lot, our full range of work as a Springfield paving contractor covers the rest of the site too.

Ready to price your project? Call or text (417) 319-2693 for a free written estimate on parking lot paving in Springfield MO.
Site evaluation and layout. We measure the lot, confirm required stall counts, and map traffic flow, fire lane access and entrance points before a single machine rolls in.
Drainage planning. Slopes and catch basin locations get set so water runs off the surface instead of pooling near entry doors and curb lines.
Excavation and subgrade prep. Failed material comes out and the soil below gets compacted. That step matters in Greene County, where clay heavy ground swells and shrinks with moisture.
Base engineering. We install and compact crushed aggregate to the depth the traffic load calls for, going deeper on delivery truck routes and dumpster pads.
Asphalt placement. Binder and surface courses go down at proper mix temperature, then get rolled to spec density while the material is still workable.
Striping and ADA layout. Once the surface cures, we mark stalls, access aisles, van accessible spaces and arrows. See our parking lot striping services for layout details.

Not every tired lot needs to come out. We walk the surface, check drainage patterns and probe the base before recommending anything, because tearing out a lot that only needed surface work wastes your budget.
| Condition | Best Move |
|---|---|
| Scattered cracks, solid base, good drainage | Crack fill and sealcoat |
| Isolated potholes with sound surrounding asphalt | Saw cut patch repair |
| Surface worn but base intact | Mill and overlay |
| Alligator cracking, soft spots, standing water | Full depth removal and rebuild |
Soft spots are the giveaway. When a section flexes under a loaded truck, the problem lives below the asphalt and no amount of overlay will hold.

Springfield weather is hard on pavement. Summer heat softens the surface, spring storms dump water fast, and winter swings above and below freezing more times than most cities south of us.
That freeze thaw cycle turns a hairline crack into a pothole in one season. Water gets in, expands overnight, and pushes the pavement apart. Proper slope, tight compaction and clean edge details are what keep that from starting.
We also plan around your operating hours. Retail lots off Glenstone often get phased in halves so half the parking stays open, and church lots typically get scheduled Monday through Thursday to stay clear by the weekend.

Beyond parking areas, we pave access drives, loading zones and truck aprons. Thicker base sections go under anything that carries delivery weight daily.
Fresh layout work improves stall counts and keeps traffic moving. Every plan includes accessible stalls, access aisles and signage that meets current ADA requirements.
New asphalt lasts longer with a plan behind it. Crack filling, sealcoating and periodic restriping protect the investment and stretch service life toward that 15 to 20 year mark.
We are a family owned crew, not a rotating subcontractor list. The same people who quote your lot are the ones on site running the paver.
Most small commercial lots take two to four days. Larger properties with drainage work or phased access can run a week or more. We give you a schedule in writing before we start.
Cost depends on square footage, base condition and asphalt thickness. A lot that needs full excavation costs more than an overlay. We provide a free written estimate so you see the numbers line by line.
Light vehicles can usually park after 24 to 48 hours, depending on temperature. Heavy trucks should wait longer. We tell you exactly when your lot is ready before we leave the site.
Yes. Accessible stall counts, access aisle widths, van spaces and signage are built into the layout from the design stage, not added as an afterthought.
Late spring through early fall gives the best results because warm ground helps compaction. We book up fast in those months, so early scheduling is worth it.
Schedule a walkthrough and we will measure your lot, review drainage, check the base condition and hand you a written estimate with a clear project timeline. There is no cost and no obligation.
Book now to lock in a slot before the busy paving season fills up. Call or text Asphalt Pavers LLC at (417) 319-2693, or reach our Springfield team through our free estimate request page.
Asphalt Pavers LLC · 434 S Belcrest Ave, Springfield, MO 65802 · Find us on Google
We use cookies to improve your experience, analyze site traffic, and for marketing. By clicking "Accept", you consent to our use of cookies. Privacy Policy.